The Teeswater River Bridge replacement project, located on Bruce Road 3 in Paisley, Ontario, began in May 2022 and continues to successfully progress on schedule. Motorists can continue to drive to, and through, Paisley while bridge construction is underway. Paisley businesses are open.

The existing bridge location will remain closed to September 2023 during construction. The project started in May with the construction of a temporary bridge that will connect Goldie Street and Church Street, over the Saugeen River, and serve as the connecting detour for motorists and pedestrians in Paisley.

Temporary Bailey bridge is being well-used

Semi-trucks, tractor trailers, and agricultural equipment are to avoid crossing at the bridge in Paisley during the construction period due to the tight turns of the in-town detour. Businesses using large trucks for shipments and deliveries are encouraged to make alternative route plans to avoid the in-town detour.

  • Projected Timeline:  Temporary Bridge Construction – Completed
  • Temporary Bridge in Operation – August 2022 to September 2023
  • Old Bridge Demolition/New Bridge Construction – August 2022 to September 2023
  • New Infrastructure Construction North of New Bridge – Starting in Spring 2023
  • Temporary Bridge Demolition – Starting in 2023 Finish 2023/ 2024