Monday, November 23rd, was the first regular meeting for the newly-elected Saugeen Shores Town Council and was one that had to deal with two contentious issues and that saw the Town Chambers filled to overflowing with residents.
First on the agenda was a public meeting regarding the proposed Neoen battery storage facility. The global company NEOEN is proposing to establish a 400-megawatt (MW) lithium-ion Battery Energy Storage System (BESS) facility on Concession 2 in Saugeen Township. The facility is proposed through a contract with the Independent Electricity System Operator (IESO) to ostensibly support Ontario’s electricity reliability needs. According to Neoen, they now have projects in 15 countries.

The first foray into Bruce County by Neoen was a proposal for the BESS to be located in Tara, which was rejected by Arran-Elderslie Council in July, 2025.
Subsequently, a five-generation-owned farm in Saugeen Township was purchased, with the new owner entering into a contract for the BESS with Neoen.
On November 23rd, the Planning Report was submitted by Bruce County Planner, Jenn Burnett, to Saugeen Shores Town Council, for information, regarding a zoning by-law amendment for the proposed battery storage facility. If a decision is made by Council at a later date to approve the amendment, the application would then move on to the County for an Official Plan amendment by County Council. A town zoning by-law amendment and County Official Plan amendment are both required to change the zoning on the 12-hectare (29-acre) portion of the property in question to permit Neoen to move forward with construction of the BESS.
The proposed facility would house 344 battery storage units, each being 8.5 m long, 2 m wide and 2.7 m high and resemble shipping containers.
At the 23rd meeting with five minutes each to speak, 23 residents came forward in opposition to the proposed facility, many of whom are surrounding neighbours and farmers, who cited a number of concerns: irreparable damage to the agricultural land, extensive noise and light pollution, a threat to wildlife and species at risk, a potential toxic pollution to groundwater and many others.
A concern that also came up many times was the possibility of fire and that Lithium-ion battery fires are extremely difficult to control. The batteries will be accessed from Tesla in the United States and the facility will be remotely monitored. “Unlike a house fire, there would be no threat to lives or animals as the facility will not be staffed and there would be no one on site. If there is a malfunction of a transformer, there is a shut-off and there would be no discharge of the batteries and no need to evacuate anyone in the area,” said a Neoen representative.
Several also raised concerns that included: why the facility was being proposed for location on prime agricultural land instead of an industrial site; what would happen if there were a fire at the facility given Saugeen Shores has a volunteer fire department; what would happen if roads were closed due to winter weather, which they often are in severe winter snow storms; how could remote monitoring be done when there is no high-speed internet in the proposed site area?
Aggregate needed for the proposed site would require more than 3,000 truckloads on Concession 2 during construction. A retired certified roads supervisor then pointed out the inadequacy of Concession Rd 2 given that its width would be unable to withstand the heavy wide-load equipment needed during the proposed construction. “This road, Concession 2, only has another five years under today’s normal traffic conditions.”
Another nearby neighbour to the proposed site, said, “They say that an exception becomes the rule at some point so why are we being asked to make exception after exception to accommodate Neoen. At what point do all these exceptions change our rules? We are being asked to make an exception for Neoen to create an industrial facility on prime agricultural land.”
It was also noted that in the past 35 years approximately 18 per cent of farmland in Ontario has been lost to development, with the number now at 319 acres every day or more than 16,000 acres per year.
Although many residents stated they are not opposed to the project per-say, they are opposed to the location, which is only three kilometres from Port Elgin and Lake Huron.
According to Eric Muller, Director of Policy for Ontario with CanREA (Canadian Renewable Energy Association), the facility would be a reservoir for electricity to store power when it’s needed. “Surplus energy is currently being sent out of the province when it could be stored. This proven technology will see more storage facilities across the province in coming years. This 20-year contract with IESO and equal partnership with SON will make Ontario’s grid more reliable, flexible and affordable. Bruce County is at the heart of the Clean Energy Frontier ambition and this is a good fit.”
The proposed project in collaboration with SON is the largest partnership in Canada and represents a milestone with Indigenous partners. The Saugeen Ojibway Nation (SON) participated in the selection of the site. There are currently 118 Indigenous-owned wind, solar and energy storage projects in operation in Canada.
Although during construction, Neoen said there would be some 200 jobs created, once in the final stage of operation, the facility would basically be un-staffed and monitored remotely from California and Australia, with perhaps a one-person employee on-call.
Jesse Tong with the National Farmers Union (NFU) of Ontario calls on Saugeen Shore to reject Neoen’s proposed facility at the selected site. “Land is a finite resource. A loss of farmland will absolutely contribute to affordability, accessibility and is a threat to our food sovereignty. These land losses are unsustainable and once the lands are paved over and lost, they are gone forever. Neoen has selected C1 over C2, citing it is marginal farmland. In no way. is it considered marginal farmland. This would set a precedent for fragmentation and urban sprawl. Prime soil takes thousands of years to develop. NFU is not against renewable energy or battery storage, it is against the sacrificing of farmland that feeds us.”
From the many questions raised, it would seem that the overall opposition view is relegated primarily to the site location on agricultural land.
Councillor Cheryl Grace said that staff had advised Council there were also several errors in the application/reports submitted by Neoen. According to Neoen, error modifications were being addressed.
Also, according to Neoen, all statements made by residents were collected by its staff and would be included in a report.
Deputy Mayor Diane Huber also pointed out that there are many questions about the application raised by staff. “Is the expectation that the next time this comes before Council in December, the errors will be addressed? Also, will the many questions raised here tonight by residents be collected and addressed by Bruce County Planning? I would like to know how we, Council, will be determined as a ‘willing host’. If we are considered a willing host, how will we know that and when?”
The Planner, Jenn Burnett, said that the report would not be coming to Council in December.
“How can we make a decision if we don’t know what our responsibilities are according to the IESO application process?” said Huber. “I really appreciate the questions that were raised here by the public. I also raise the question about last-minute communications we have been receiving. In addition, what would the benefits be to the municipality when it comes to infrastructure costs. We need to understand that. This is in our geographic area and what would be the direct benefit if this were approved?”
According to Neoen, a benefit program has not yet been put in place but Neoen recognizes there will be infrastructure costs and property taxes, etc., but said “… there would be no cost to Saugeen Shores taxpayers.”
Mayor Luke Charbonneau asked significant questions of the Bruce County Planner.
- Q Language in the By-law 2B defines energy storage systems that includes flywheels, fuel storage – why? Are we also approving all these for the site?
The Planner: “The definition was put forward by the applicant but they can be removed.” The Mayor indicated that he preferred them to be removed.
- Q Justification for ‘temporary nature’ of the application? Is there industrial use on agricultural land that has been approved for 20+ years anywhere in Bruce County?
The Planner: “The IESO contract is for 20 years with a potential to extend it – therefore, it’s an ‘interim’ use of the land under a lease as the land is to be rejoined to the property after decommissioning and, therefore, it is not ‘temporary’ but is ‘interim’. The lease is for 20+ years and, under ‘Temporary’ designation, it could only be for three years with an extension of three years.
- Q In the Planning Report the word temporary is used. This is temporary and not temporary, permanent and not permanent. We are retaining the agricultural zone for an industrial use for a temporary time but not applying the Planning Act use of 20+ years. What is the planning justification? Why are you not proposing a re-zoning to industrial? How do you keep it agricultural but it’s for an industrial use?
The Planner: The proposal exceeds the ‘temporary use’ time-frame and, therefore, amending the zoning to permit the BESS to occupy the 29 acres and not re-zoning to industrial reinforces that it can be returned to agricultural use. It prevents future industrial uses to be co-located on the property and, after the life span of the BESS has expired, it will be returned to agricultural.
- Q We are permanently permitting this industrial use on agricultural land. In the justification report, the rural vs agricultural designation, Neoen’s argument is that it is on rural land – that the BESS is on rural designated land. Bruce County OP has updated the LER mapping for agricultural zoning and there will be no rural designation. It is now 100 per cent agricultural and the rural designation has disappeared. Does that concern you? (to the planner)
Planner: That’s a Policy review and will be brought to be brought to Council.
- Q Neoen’s Justification report in the Town zoning by-law – utility infrastructure (power liens, water lines, etc.) are allowed in all zones. The proponent intimates the BESS is part of the utility infrastructure. Do you feel a battery energy storage on this scale is the same as power lines, water lines, cable TV, gas, utilities, etc. that a BESS is just part of transmission infrastructure?
The Planner: The proposal was discussed by County and Town staff and the by-law constitutes a land use and not infrastructure. The proposal far exceeded what the by-law permits for infrastructure and that’s why the applicant brought it forward for a re-zoning amendment by the Town and the Bruce County OP.
Councillor Neil Sarginson of the Saugeen Ward asked, with monitoring from California and Australia that, if internet connectivity is lost, will the facility shut down until it’s restored?
Neoen assured that a ‘fail safe’ is in place to halt all activity at the site.
A Community Liaison Committee (CLC) of residents has also been formed where members had to commit to six months. According to members, if someone misses a single meeting, he/she is no longer part of the CLC.
“We are being asked to make a re-zoning amendment on this land and it will be permanent. Also, what will the sound barriers be?”asked Deputy Mayor Diane Huber.
“Not long ago, there was a request for a severance on this land for a house and it was denied,” she added. “Now, the environmental hazard (EH) stipulation piece on that original application has disappeared. Why do we not need to be concerned about the protected land that was there?”
Vice-deputy Mayor Bud Halpin also wanted to know how much information was missing or outstanding in order for Council to consider the application.
The Planner said that the report will come back with a full Policy Review, exploration of the studies submitted in addition to answers on public’s concerns and a recommendation for Council.
The resolution that the report regarding Zoning By-law Amendment – Z-2026-028 by NEOEN be received for information.